logo
Products
PRODUCTS DETAILS
Home > Products >
Modular Air Handling Unit For HVAC System Heat Recovery Air Handling Units

Modular Air Handling Unit For HVAC System Heat Recovery Air Handling Units

MOQ: One
Price: negotiable
Standard Packaging: Specialized packaging film
Delivery Period: 35 work days
Payment Method: Western Union,MoneyGram,T/T
Supply Capacity: 1000 units per month
Detail Information
Place of Origin
Guangzhou, Guangdong, China
Brand Name
JETEX
Certification
ISO quality system certification
Model Number
AHU
Air Volume:
2000m³/h-100000m³/h
Function:
Cooling, Heating, Humidifying, Dehumidifying, Filtering, Purifying And Sterilizing
Panel Material:
Double-layer Insulation Cotton Board, Color Steel Plate, Galvanized Steel Plate, Stainless Steel Plate
Name:
Combination Air Handling Units
Highlight:

HVAC System Air Handling Units

,

Heat Recovery Air Handling Units

,

Modular Air Handling Unit

Product Description

What are the components of air handling units?

In general, an AHU’s purpose is to achieve improved indoor air quality. The first step in this is always to transfer outside air into the AHU for treatment. This process happens either directly, if the unit is placed outdoors, or via a duct system. 
Inside the AHU, treatment begins to take place, with removing particulate matter from the air and thermally treating it to meet the specific application. This can either be heating the air or cooling the air. 
The air is then distributed throughout the building. In the case of bidirectional units, the AHU simultaneously gathers extracted air from the duct system and transports it out of the building. All of this is done using a highly efficient energy recovery system to ensure that the machine is as energy efficient as possible. 


Fuctional sections:Air filters,Heating and cooling components,Fans,Silencers ,(De)Humidifier,Sterilization ,etc.


Lead time       


Quantity (units) 1 - 1 > 1
Lead time (days)     35   To be negotiated


Customization options

Customized logo (Min. order: 10 units)
Customized packaging (Min. order: 10 units)
project solution (Min. order: 5 units)
Products
PRODUCTS DETAILS
Modular Air Handling Unit For HVAC System Heat Recovery Air Handling Units
MOQ: One
Price: negotiable
Standard Packaging: Specialized packaging film
Delivery Period: 35 work days
Payment Method: Western Union,MoneyGram,T/T
Supply Capacity: 1000 units per month
Detail Information
Place of Origin
Guangzhou, Guangdong, China
Brand Name
JETEX
Certification
ISO quality system certification
Model Number
AHU
Air Volume:
2000m³/h-100000m³/h
Function:
Cooling, Heating, Humidifying, Dehumidifying, Filtering, Purifying And Sterilizing
Panel Material:
Double-layer Insulation Cotton Board, Color Steel Plate, Galvanized Steel Plate, Stainless Steel Plate
Name:
Combination Air Handling Units
Minimum Order Quantity:
One
Price:
negotiable
Packaging Details:
Specialized packaging film
Delivery Time:
35 work days
Payment Terms:
Western Union,MoneyGram,T/T
Supply Ability:
1000 units per month
Highlight

HVAC System Air Handling Units

,

Heat Recovery Air Handling Units

,

Modular Air Handling Unit

Product Description

What are the components of air handling units?

In general, an AHU’s purpose is to achieve improved indoor air quality. The first step in this is always to transfer outside air into the AHU for treatment. This process happens either directly, if the unit is placed outdoors, or via a duct system. 
Inside the AHU, treatment begins to take place, with removing particulate matter from the air and thermally treating it to meet the specific application. This can either be heating the air or cooling the air. 
The air is then distributed throughout the building. In the case of bidirectional units, the AHU simultaneously gathers extracted air from the duct system and transports it out of the building. All of this is done using a highly efficient energy recovery system to ensure that the machine is as energy efficient as possible. 


Fuctional sections:Air filters,Heating and cooling components,Fans,Silencers ,(De)Humidifier,Sterilization ,etc.


Lead time       


Quantity (units) 1 - 1 > 1
Lead time (days)     35   To be negotiated


Customization options

Customized logo (Min. order: 10 units)
Customized packaging (Min. order: 10 units)
project solution (Min. order: 5 units)
Sitemap |  Privacy Policy | China Good Quality Air Handling Units Supplier. Copyright © 2024-2025 GUANGZHOU JETEX-LLOYD'S MACHINERY LTD . All Rights Reserved.